English | 中 文


News > Sinopec 28.05.2019

Open Package Inspection at Sinopec Yangzi 100 KTA  EVA Project (May 13th)


On May 13, 2019 equipment has arrived to Sinopec Yangzi Petrochemical 100 KTA  EVA project site. Beijing Renda has performed an open inspection of the delivered equipment.


Inspection
Inspection
Inspection
Inspection
Inspection