English | 中 文


News > Jiangsu Sailboat 13.03.2017

Startup of Jiangsu Sailboat plant (13.03.2017)

200,000 Tons / Year EVA plant of Jiangsu Sailboat Petrochemical Co., Ltd. has successfully produced the product on Mar 13th, 2017 during first startup. Beijing Renda has supplied High Pressure product separator, High pressure valves, Interlocking system, Hydraulic Power Unit, High Pressure Valve Test Station, waste recovery system, explosive proof crane, and other equipment and provided on site service to assist EPC contractor and end user in all possible ways to ensure a successful start up.




Startup
Startup
Product