Jiangsu Sailboat Tubular HPU onsite service (01.11.2016)


Onsite service for Jiangsu Sailboat Tubular HPU has been successfully performed. During 8 days of commissioning (Oct 25, 2016-November 1, 2016), we have filled nitrogen in local accumulator manifold skid and both back up stations, and all pressure reached above 135bar, filled the tank with lubricate oil, pressurized all the piping from HPU to local accumulator manifold skid, checked and tested all the instruments in HPU to make sure all the signals are well received in DCS, successfully flushed the whole system.
 